 The site awaiting construction. |
 Here we used the Mini Digger as this was made up ground and had to dig upto 1000MM depth. |
 With the Damp proof membrane in place the rafters are installed. |
|
 With the lower section in a Brown smooth brick finish to complement the original property, we now have started to fit the fully insulated dwarf walls with XPM and ready to render. |
 The far wall is full height and to get the box gutter at the facial height we have had to extend the frame and wall height from 2100mm to 2350mm. |
 Installing the fully structural BBA Ultraframe Classic roof, awaiting glazing with Pilkington Activ Blue, Self Cleaning. All our glazing is Pilkington K Argon Gas Filled. |
|
 XPM awaiting plastering. |
 Fully insulated floor. |

Decorative Fascia insert. |
|
 Plasterers scratched coated, awaiting the final float coat render. |
 Plasterers Final coat, float finished now awaiting painting to match existing property. |
 Fully finished with Decking. A joy to hold any social gathering , or simply just to chill out and relax. |
|
 A magnificent structure to compliment this wonderful home. The valuation with this conservatory now exceeds the original investment to purchase the conservatory. A truly wonderful investment. |
|
|